-48 VDC Battery Cabinet Installation and User Manual
Connect the power system''s battery cable terminated in an Anderson connector to the first battery cabinet''s battery cable terminated in a mating Anderson connector.
Connect the power system''s battery cable terminated in an Anderson connector to the first battery cabinet''s battery cable terminated in a mating Anderson connector.
Push the third battery cabinet into position, align with the seismic anchoring (if any), level the battery cabinet, and interconnect with the other battery cabinets as described in step 2, step 3,
The battery cabinet must be installed in a temperature controlled area free of conductive contaminants. Install on a level, solid surface (e.g. concrete or floor stand) that can support the
Connect the battery cable accessory to one end of the battery port on the rear panel of the UPS and connect the other end to any battery port on the rear panel of the EBC.
Route the ground wire (from the field kit) from the ground stud in one battery cabinet, under the lower battery tray and through the cabinet-to-cabinet cable access area in the side of the
For ordered cabinets as connected (battery cabinets will bolt to each other), the busbars are connected between battery cabinets with the supplied power cables.
Owner''s manual, Extended-run single-phase battery cabinet • Read online or download PDF • Tripp Lite Extended-Run Single-Phase Battery Cabinet User Manual
Connect main cables from the UPS DC input terminals to the battery cabinet output. Refer to the supplied battery cabinet drawings for information on the battery cabinet output connections.
Read ALL instructions thoroughly before attempting to move, install or connect your battery cabinet. Failure to comply may invalidate the warranty and cause serious property damage
The BC16 battery cabinet is equipped with four casters, two swivel types in front and two rigid types in the back. Move the cabinet into the desired location and lock the front casters.
PDF includes complete article with source references for printing and offline reading.
Download detailed specifications for our distributed PV energy storage systems and liquid cooled ESS containers.